Industrial

PF Formation Sand Wash Plant and Pit 4, Maroota

Main switchboard for a CDE 400 tph sand wash plant, the Pit 4 switchroom and reticulation, then ongoing maintenance.

Aerial photo of the PF Formation sand wash plant at Pit 4, Maroota, in November 2023

Photo: Pit 4, November 2023

Builder or client
PF Formation (direct)
Location
Maroota NSW
When
2022 to 2024, maintenance since
Sector
Industrial

PF Formation runs a CDE sand wash plant rated at 400 tonnes an hour at its quarry at Maroota. We built its main switchboard in our own workshop: 16 modules with an ACB incomer, CT metering, MCCBs, drives and soft starters.

The Pit 4 upgrade followed, with a container switchroom, conduits across the pit, cable tray, motor and control cabling, a pump control board and the site communications.

We have maintained the plant since: flood repairs, drive and motor replacements and PLC fault-finding, by electricians who know the plant.

What We Did

  • Main switchboard for the CDE 400 tph wash plant, built in our own shop: ACB incomer, CT metering, MCCBs, drives, soft starters, 16 modules
  • Pit 4 upgrade: container switchroom, conduits across the pit, tray, motor and control cabling, pump control board, site communications
  • Flood repairs, drive and motor replacements, PLC fault-finding, quarry maintenance

Services on This Project

Industrial plant and equipment, Switchboards, Service and maintenance

All projects