Prequalification
Prequalification
What a builder's contracts team needs to prequalify us, in one place.
Company
| Company | Vorick Group |
| Legal entity | Vorick Group Asset Maintenance Pty Limited, ABN 44 601 045 872 |
| Established | August 2014, by Dean Houghton and Joshua Attard |
| People | 30: licensed electricians, apprentices and management staff |
| Office and switchboard workshop | Unit 2, 7 Precision Place, Mulgrave NSW 2756 |
| Phone | (02) 7233 1895 |
| Prequalification forms and tenders | [email protected] |
Licences and memberships
| NSW electrical contractor licence | 319114C (check it on the NSW licence register) |
| NSW master security licence (class MB) | 000109301 (check it on the NSW security licence register) |
| NECA member | N037467 |
Insurance
| Public liability | $20,000,000 any one occurrence |
| Products liability | $20,000,000 in the aggregate |
| Professional indemnity | Held |
| Workers compensation | Held |
Certificates of currency are supplied with every tender and prequalification submission.
Policies
Our policies are reviewed at least every two years.
POLICY
Work health and safety policy
Our commitments to the health and safety of our workers, our clients, the people at the places we work and the public.
Available on request
Safety
- WHS policy and safe work method statements for low-voltage electrical work, working at heights, work near overhead and underground services and work that may disturb asbestos, reviewed annually and for each site
- A staff licences and certificates register checked monthly; licence and competency records supplied for prequalification and site inductions
- Site inductions and SWMS sign-on, daily prestarts, toolbox meetings and test and tag to AS/NZS 3760
- An isolation register and permit for work in live switchrooms
Quality and handover
- Inspection and test plans with the client's hold points, test records for every circuit and factory test sheets for every board we build
- Installations tested to AS/NZS 3000 and a Certificate of Compliance for Electrical Work lodged for every job
- A handover pack from one template: certificates, test records, as-builts, warranties, operation and maintenance manuals
- Design records kept with the job: cable sizing and voltage drop calculations, protection grading studies, switchboard drawings
What we send with a prequalification
- Certificates of currency for each insurance
- The NSW licence register extract
- Licence and competency records for the people on the job, under your contractor management process
- Our WHS policy and the safe work method statements for the work
- Referees, on request
Capability statement
Our capability statement sets out the services, sectors, clients and projects in one document.
Available on request: [email protected]
Prequalifying us?
Send your form to [email protected], or call (02) 7233 1895.
