Redbank, North Richmond
Two site main switchboards, the cafe and kiosks, then the IGA, carpark and strip shops, over two stages.

Photo: the cafe on the lake at Redbank, at dusk
- Builder or client
- North Richmond Construction
- Location
- North Richmond NSW
- When
- January 2023 to July 2026
- Sector
- Retail
Redbank is at North Richmond, in the Hawkesbury. Vorick Group did the electrical work on stages 1 and 2 for North Richmond Construction, from January 2023 to July 2026.
Stage 1 began with the two site main switchboards, MSB East 1 and 2, which we built in our own workshop at Mulgrave NSW, and the cafe and kiosks. In stage 2 we did the IGA, the carpark and the strip shops.
What we did
- Stage 1: two site main switchboards, MSB East 1 and 2, built in our own workshop
- Stage 1: the cafe and kiosks
- Stage 2: the IGA, the carpark and the strip shops

Photo: the cafe and the building beside it, from across the lake
Related projects
All projects
Bowral Commercial Development
Retail development for Kookai, Mecca, Oroton and Seed, with the main switchboard and boards from our own workshop.
Paynter Dixon
Cranebrook retail precinct, Penrith
Full electrical package for a new retail centre at Cranebrook, plus the El Jannah fit-out.
DSD Group
2 Ultimo Place, Marsden Park
Main switchboard, mains, power and data, NBN, dry fire, generator and five fit-outs for a large format retail precinct.
DSD GroupTendering a project?
Send the drawings and specification to [email protected], or call (02) 7233 1895.
